glxbal9136 glxbal9136
  • 20-02-2024
  • Mathematics
contestada

A floor with an area of 10 m² can be tiled by 3 workers in 8 hours. Work out how long it would take 4 workers to tile a floor that is 25 m² Assume that all workers can tile at the same rate. ​

Respuesta :

Otras preguntas

Need help with this maths question.
d=vit + at solve for vi
I want to drive to Miami, which is 675 miles away. If my car gets 24 miles per gallon of gas costs $2.50 a gallon, how much would it cost to drive to Miami?
how do I draw and shade a figure that represents 100% 100% and describe it in words ?
If f(x) = 2x - 1, find f(a+h).
solve 8t + 4= 3(t-1)+7 pls sove step by step fast
[tex]30 \div 839 [/tex]​
two question pls solve very fast step by step
. Describe the demographic differences between the Spanish Empire in America and empires to the north. What impact did European diseases have on colonization ef
What is the charge of the hydrogen atoms due to this unequal pull of electrons? Positive or negative?