AprilCarr9957 AprilCarr9957
  • 20-03-2024
  • Engineering
contestada

The beam to beam distance is 6m x 6m. Calculate for the beam and column design External loading (Roof)
Snow load = 0.6k(N)/(m²)
Services = 0.4k(N)/(m²)
Roof finishes = 0.4k(N)/(m²)
Concrete s

A) 0.6k(N)/(m²)
B) 0.4k(N)/(m²)
C) 0.3k(N)/(m²)
D) 0.5k(N)/(m²)

Respuesta :

Otras preguntas

Using prime factorization what is the LCM of 18 and 108
can someone help me please ? I'm trying to hurry and get this done
What contains the main idea in a paragraph
How do you write 0.632 in expanded form
At a local hospital, 35 babies were born. If 25 were boys, what percentage of the newborns were boys?
Complete combustion of 5.90 g of a hydrocarbon produced 19.2 g of CO2 and 5.89 g of H2O. What is the empirical formula for the hydrocarbon?
Katrina saved $2,000 to purchase her tablet. Her father spent 10 times as much money to buy his new computer. How much did her father's computer cost?
What is 234/999 simplified
which best describes the underlined words in the sentence? the astronomy students went on a field trip to the observatory a. complete subject b. compound subjec
parents are a large factor in how their children perceive their bodies. true or false.