It takes 18 electricians 35 days to wire a new housing subdivision. how many days would 28 electricians require to do the same job?

Respuesta :

calculista
calculista calculista
  • 26-05-2018
let
x----------> number of electricians
y---------> number of days to do the job

we know that
y=k/x
k is the constant of variation
for x=18   y=35 
35=k/18-----> k=630
so
y=630/x
for x=28 
y=630/28----> y=22.5 days

the answer is
22.5 days
Answer Link
leavonhilgers leavonhilgers
  • 28-10-2019

Answer:

22.5

Step-by-step explanation:

Answer Link

Otras preguntas

how do you earthquake proof an airport?
Which of the following was one of the characteristics of the ancient city of Mohenjo-Daro? a The city had several large pyramids similar to those found in Egypt
Whats an entire group of muscles that work together called?
how to divide 14.6 divided by 2
how did Uzbekistan become a country?
Example of an expression with 4 terms
how to factorise this?! 4x-14xy
Jack is 1.75 m tall and casts a shadow 2.25 m long. At the same time, a statue casts a shadow 9 m long. What is the height of the statue? a. 4 m b. 7 m c.5.75 m
Why was England irritated with New Netherland?
How would I find the day of my next birthday without using a calendar and maybe a linear sequence.