deysifajardo2316 deysifajardo2316
  • 18-08-2018
  • Mathematics
contestada

Dan can tile a floor in 3 hours. his assistant could tile the same floor in 8 hours. if they work together, how long will it take to tile the floor?

Respuesta :

wolf1728
wolf1728 wolf1728
  • 18-08-2018

There is a formula for this:

Total Time = (worker1 * worker2) / (worker1 + worker2)

(3 * 8) / (3 + 8)

24 / 11 =

2.1818181818 hours


Answer Link

Otras preguntas

what is the purpose of including this sentence in a memoir? failing my math exam made me realize that the habit of procrastination is bad. it taught me the impo
Which of the following Best describes the outlook of World War l at the beginning of 1918?A. It looked as if the Allied Troops had a clear victory.B. Germany wa
What is the pH of a 0.75 M HNO3 solution
A stack of cards is numbered 1 to 21. Kelly pulls one card from the stack. What is the best approximation for the probability that the card is an even number?
in milgram's experiment, compliance, or doing what the experimenter asked, dropped when: a. the learner stopped responding b. the teacher and the learner were
Why is the lack of a hierarchical structure a problem for political parties
(there is more than one right answer) The Treaty of Guadalupe Hidalgo (1848): ended the war between the United States and Mexico. completed the continental expa
which Latin American country won independence from France
Which structures are found in the human female reproductive system? A) ovaries and uterus B) ovaries and testes C) prostate and uterus D) uterus and vas defe
Add (12x+5) + (3x-7)