hartbrakerobby hartbrakerobby
  • 17-06-2019
  • English
contestada

Why is chronological order an appropriate way to organize a project planning document-apex

Respuesta :

elise22203
elise22203 elise22203
  • 17-06-2019
Chronological: (of a record of events) starting with the earliest and and following the order in which they occurred.

Chronological order is important in organizing a project planning document because a project needs to be completed in a particular sequence. All written work has an order. Writers need to find which order will make the written piece flow and make sense. In the case, the order in which a project is planned -starting from first step then to the last step- is important to the piece.
Answer Link

Otras preguntas

A gift box is in the shape of a trapezoidal prism with the base lengths of 7 inches and 5 inches and a height of 4 inches. The height of the gift box is 8 inche
Acid rain can form when ____________________ in the air mixes with sulfur oxides to form sulfuric acid.
What area of Europe was Martin Luther King Jr from?
(2a2 + ab + 2b) + (4a2 − 3ab + 9)
Write nine and thirty-six hundredths with a decimal point
Which of these statements describes the relationship between urbanization and the division of labor during the Bronze Age? A. As people became more interdepend
Which one of David's paintings is interpreted as a symbolic call to revolution?
jean adds 35 and 9. How can she solve using only equations to model her thinking?
What rock contains fossils?
Which tuning fork would sound lower,one with frequency 512 Hz or 128 Hz?