A bar graph that shows what projects or tasks are in process and how much of each is completed is called a(n):
a. Gantt chart.
b. Stem chart.
c. Grid chart.
d. Priority chart.

Respuesta :

metchelle
metchelle metchelle
  • 01-07-2016
The correct answer is option A. Gantt chart. A bar graph that shows what projects or tasks are in process and how much of each is completed is called a Gantt chart. A Gantt chart is a horizontal bar graph that shows the number of work done or completed production in a certain period of time. This production tool is developed by Henry L. Gantt, an American engineer, in 1917.
Answer Link

Otras preguntas

answer these questions ​
Professor Jones Sad Ve are aware at the SC That Courted last year wrecked thecenvironment."Rewrite the sentence above starting with Professor Jones said that​
1- The acceleration of a particle is defined by the relation a = 6 ft/s 2. Knowingthat s =-32 ft when t = 0 and v= -6 ft/s when t = 2 s, determine the velocity,
The two cylinders below are similar. What is the length of the altitude of the smaller cylinder? Α. 5 Ο Ο B. 27 C. 2 Ο Ο D. 3
In a chemical reaction, substances react in a specific ratio. Chemical reactions are used to make many products, including food. For a company that carries out
Ukusebenza kusakhanya essay ​
How are MOST civil cases settled?
Describe an example of a plant responding to environmental stimuli
3. Alice __________________ herself while she __________________ football. (HURT, PLAY) 4. She __________________ while she __________________ after the bus. (F
questao 1 o que voce acha sobre a origem dos autorretratos