contestada

Crashing almost always accelerates the schedule while increasing project risk, whereas fast tracking almost always accelerates the schedule while increasing project cost.A. TrueB. False

Respuesta :

gerald4764
gerald4764 gerald4764
  • 24-01-2020

Answer: False

Explanation: Because fast-tracking doesn’t involve additional resources, it’s usually best to start with this technique while Crashing requires careful planning to prevent “panic mode” among the project crews and to avoid acceleration claims.

Answer Link

Otras preguntas

What is new england colonies?
Simplify completely: 2 square root 3 - square root 6 all over 3 square root 6 + 2 square root 3
A farmer planted 2/5 of his 60 acres in beans and 4/10 of his 60 acres in corn. What fraction of the 60 acres had been planted in beans or corn
A CAUSE of the First Crusade was the __________. a.conquest of Constantinople by the Ottoman Turks b.invasion of Spain by the Muslim Arabs c.attack by the Musli
What was an important concern for the Founding Fathers when drafting the Articles of Confederation? a: avoiding tyranny of a powerful central government b: gran
What was promised to slaves that encouraged them to fight for the British? A.land B.money C.freedom D.education
George wants to put carpeting in a rectangular living room and a square bedroom. The length and width of the living room is 12 feet by 18 feet one side of the s
How do you write 1.3062 in Expanded Form?
What is the expression (a^2+b^2)^2 is equivalent to
What is a fresco? A. a form of art in which watercolors are applied to natural stone B. a new start on a piece of art C. a painting that artists create by apply