eddou55 eddou55
  • 21-02-2020
  • Mathematics
contestada

Five workers can do a job in 20 days how many days can 4 workers do the same job?

Respuesta :

silviasantos575 silviasantos575
  • 21-02-2020

Answer:

16

Step-by-step explanation:

20/5=4

4x4= 16

Answer Link
igoroleshko156
igoroleshko156 igoroleshko156
  • 21-02-2020

Answer:

16 days

Step-by-step explanation:

Step 1:  Cross multiply

[tex]\frac{20}{5} = \frac{x}{4}[/tex]

20*4 = x * 5

80 / 5 = 5x / 5

16 = x

They can finish the job in 16 days

Answer Link

Otras preguntas

2x+3=7 this equation has multiplication and addition in it. to solve this equation you need to get x by itself which means you need to get 2x by itself first. h
According to von neumann and morgenstern’s utility index, decisions are made to maximize… expected utility expected monetary value expected marginal loss.
Ms. Francis is planning a birthday party for her daughter. There will be 22 children at the party, and in order to seat them all she needs to rent square card t
The cotton gin was a great invention for food production. true or false
STRUCTURE Find the measure of each angle in the diagram. (3y+11) 10yº (4x - 22)º (7x + 4)º
Yo ____ doce años. Group of answer choices tenemos tengo tiene tienes Please help! Thanks In advance
what are disadvantages of soil?​
A rocket flies 10 km vertically, then 20 km at an angle of 15° to the vertical and finally 60 km at an angle of 26° to the vertical. Calculate the vertical heig
What is the perimeter of this polygon? 4 (-1, 2) (-2,-3) -2 -2 (2,4) 2 4 (3,-2) X
What is the pressure of 0.540 mol of an ideal gas at 35.5 L and 223k