010695
010695 010695
  • 21-02-2020
  • Mathematics
contestada

A worker takes a random sample of 150 bolts and finds that 18 of them are either too long or too short, thus making them unusable. Estimate the number of unusable bolts in a production of 11,000 bolts.

1,320 bolts
860 bolts
340 bolts
450 bolts

Respuesta :

lilly12607 lilly12607
  • 21-02-2020

the answer is 1320 bolts

Answer Link

Otras preguntas

Which ordered pair must be removed to make the relation a function. {(1, −5), (2, −4), (3, 4), (4, 3), ( 3, -4)}
Consider the graph of the quadratic function y = 2x2 - 4x + 2. How many zeros does the function have? ob 6 2 -2 2 -2
How do you find the theoretical probability of something
What does area III on the map indicate? A. Mexican Cession B. Northwest Territory C. Oregon Country D. Texas Annexation
PLS ANSWER ASAP 12 POINTS
8 1/2 minus 7 1/4 in fraction form?
The corporate charter of Llama Co. authorized the issuance of 12 million, $1 par common shares. During 2021, its first year of operations, Llama had the followi
What is the typical educational requirement
what type of metal is copper
Giving brainliest for CORRECT awnser. Check ALL that apply.