4) How much concrete was required to make the Hoover
Dam? Where did this concrete come from?

Respuesta :

Аноним Аноним
  • 02-11-2020

Answer:

Three and one-quarter million cubic yards.The initial concrete required for the dam was mixed in a river-level mixing plant which was located approximately 3/4 of a mile upriver from the dam site This plant provided the concrete for the linings in the diversion tunnels and for the lower levels of the dam. It went into operation on March 3, 1932.

Explanation:

Answer Link

Otras preguntas

Which two nations battled for control over Silesia as part of the Third Silesian War, one of the conflicts of the Seven Years’ War?
Which of these completes the graphic?
PLEASE SOLVE NOW I WILL MARK BRAINLEST IF SOLVED if line a is parallel to line b, line b is parallel to line c then line a should be perpendicular to line c
help what is -4 +*(89-79)
What was the system of government in ancient Egypt? A. a republic B. an oligarchy C. a theocracy D. a democracy
Pls help and also in order pls?
help me ASAP PLZZZZZ
Which of these scenarios describes the USE of credit? paying more for an item than its original cost items could be repossessed if payments are not made on time
Who controls capitalism
Which phrase describes the location of Antarctica? east of Africa close to the equator on the prime meridian in the Northern Hemisphere