sandalimendes8 sandalimendes8
  • 16-12-2020
  • Mathematics
contestada

Four men take 6 days to complete a certain work. Find the number of men needed to complete the same work in 8 days

Respuesta :

scootermaster34
scootermaster34 scootermaster34
  • 16-12-2020

Answer:

the answer is 5 men i think

Answer Link
morenos2024
morenos2024 morenos2024
  • 16-12-2020
The guy above me is right
Answer Link

Otras preguntas

Technological advances like cartography, navigation, and shipbuilding during the Renaissance led to
Which word best describes the tone of this stanza from Blake's "Laughing Song?"
What is intended in "Revolutionary Tea" by singing about King George III as an "island queen?" to mock him as weak to evoke sympathy for him to criticize his mo
what was one result of the battle of Fallen Timbers
A given hydrocarbon is converted completely to carbon dioxide and water, and equal numbers of moles of co2 and h2o are produced. the hydrocarbon would be
What is the solution to the equation 1 over 21 multiplied by x is equal to 1 over 7? x = 3 x = 14 x = 28 x = 147 The cost of 2 bottles of ketchup is $7.96.
Which organ lies in the lateral and posterior portion of the left upper quadrant of the abdomen?
The table below shows salinity tests from coastal Louisiana following a salt water influx during hurricanes Katrina and Rita. If efforts are not made to reduce
maria feels beleguered on tge first day of school. Does her facial expression show confidence or panic? why?
The central goal of the delegates to the constitutional convention was to: