slmmacho slmmacho
  • 19-01-2021
  • Mathematics
contestada

four employees can wash 20 service vehicles in 5 hours how long would it take 5 employees to wash the same number of vehicles

Respuesta :

brownricegirl
brownricegirl brownricegirl
  • 19-01-2021

Answer:

20 x 5 = 100

Step-by-step explanation:

Answer Link
xavionryans xavionryans
  • 03-02-2021

Answer:

100

Step-by-step explanation:

Answer Link

Otras preguntas

A child pulls a balloon for 12 m with a force of 1.0 N at an angle 60° below horizontal. How much work does the child do on the balloon? What equation do i use
Find the total cost: $2,500 bill with 6.5% tax
what did louis the XVI do that economically hurt France?
What are some examples of countries in which there is Goat Aid?
Hello! I apologize that this question is so long. Please just help me as much as you can. Thanks! During the period 1992-2000 the number C (in million)of people
What was the purpose of the Roosevelt corollary?
In triangle ABC,D is a point on side AC such that BD=DC and angle BCD measures 70 degrees. What is the measure if of angle ADB?
What are the fundamental beliefa of capitalism?
Communism is very similar to the following economic system in that the majority of the world belongs to the state
How do you do One-Step Equations?