barshadhungana502
barshadhungana502 barshadhungana502
  • 19-01-2021
  • Mathematics
contestada


If 2 men and 3 boys can do a piece of work in 8 days, how long will 3 men and 4 boys take to do it?​

Respuesta :

LAASMITH7
LAASMITH7 LAASMITH7
  • 19-01-2021

Answer:

they would do it in 13 days

Answer Link

Otras preguntas

A circular-motion addict of mass 77 kg rides a Ferris wheel around in a vertical circle of radius 10 m at a constant speed of 5.6 m/s. (a) What is the period of
Benefits of clean house
50 points. How do I find circumference? I don't need just the formula, I need the whole process, and maybe an example please and thank you <3. I'd appreciate
Which of the following applies to a DNS caching server? (Choose all that apply.) Group of answer choices __It eliminates the need to have DNS replication __I
Who has the power to impeach United States president? what is the process that they have to go through?
Which of the following is a result of the construction of a median of a triangle? An angle of the triangle is bisected. A perpendicular segment is created from
- Study the statement above. Nitrogen is NOT a part of rogen is NOT a part of which of these biomolecules? a. enzyme b. amino acid c. nucleic acid d.carbohydrat
Jessie is saving up for a purse that is $890. She gets $8 allowance per week, and already has $80 saved up. How long will it take Jessie to buy the purse?
Which sentence most belongs in a procedural text – aimed at an audience of ten-year-olds – about how to open a small bakery? Research dietary trends and dining
4. What do calories measure? sugar energy mass weight