lilliahj lilliahj
  • 18-05-2021
  • Mathematics
contestada

HELP FAST PLEEASE!!! ASAP

HELP FAST PLEEASE ASAP class=

Respuesta :

flemingb
flemingb flemingb
  • 18-05-2021

Answer:

About 6.32 hours.

Step-by-step explanation:

P= production

t=# of hours needed

How many hours are needed to reach the production level of 400?

Plug the numbers into the formula given.

400=300+50 ( t-10 squared)

Combine like terms-  400=350 (t-10 squared)

subtract 350 from itself, then do the same to the other side.

400-350=350-350(t=-10 squared)

50= (t-10squared)

50-10= 40 squared

40 squared= about 6.32.

Hope this helps! Have a nice day :)

Answer Link

Otras preguntas

Name four behaviors that animals must use to survive
what is a rational number between -1/6 and -2/6
what is E=m² the famous theory of albert einstien?
2 m3 of soil containing 35% sand was mixed into 6 m3 of soil containing 15% sand. what is the sand content of the mixture?
What are the organelles of a cone cell?
2 m3 of soil containing 35% sand was mixed into 6 m3 of soil containing 15% sand. what is the sand content of the mixture?
2 m3 of soil containing 35% sand was mixed into 6 m3 of soil containing 15% sand. what is the sand content of the mixture?
Caitlyn did 6/7 of the problems on her math correctly and 4 incorrectly. She did all the problems. How many were there?
Caitlyn did 6/7 of the problems on her math correctly and 4 incorrectly. She did all the problems. How many were there?
What are the organelles of a cone cell?