pandaflowers56
pandaflowers56 pandaflowers56
  • 20-05-2021
  • Mathematics
contestada

A group of workers can plant 49 acres in 7 days. What is there rate in acres per day?

Respuesta :

5458360nw
5458360nw 5458360nw
  • 20-05-2021

Answer:

Step-by-step explanation:

343

Answer Link
Aniza07
Aniza07 Aniza07
  • 20-05-2021

Answer:

7

Step-by-step explanation:

Answer Link

Otras preguntas

A bag has 2 blue marbles and 16 red marbles. half of the red marbles are made of plastic. a marble is selected a random from the bag what is the possibility tha
Describe how scientists make inferences on whether water is polluted or not
area of a triangle b-2s^2+3t^2 h-4s^2-3t^2
At a recent job fair, there were 2/3 as many inquiries about jobs in health care as in electronics and 50 fewer inquiries about teaching as electronics. A repor
Text: What are puppet shows about? Some teach a lesson. Some tell the history of a place. Long ago there were no TVs. There were no newspapers. People learned t
21. Which of these eras brought about the end of the European economic practice of mercantilism? A.) Scientific Revolution B.) Protestant Reformation C.) Coloni
calculate the molar mass for each of the following compounds 7. PbSO 8. Ca(OH)2 9. Na3PO4 10. (NH4)2CO3 11. C6H12O6 12. Fe3(PO4)2 13. (NH4)2S 14. Z
Simplify (4.5)(5)(−2). (1 point)
4. Which of these is an example of European imperialism in Africa? the increase in the spread of infectious diseases such as tuberculosis. the decrease in agric
Describe how your community could better prepare its citizens for that natural disaster List three specific items it can improve