dalilah04 dalilah04
  • 20-08-2021
  • Mathematics
contestada

In 6 days, a group of workers can plant 30 acres.
What is their rate in acres per day?

Respuesta :

juanaroa333
juanaroa333 juanaroa333
  • 20-08-2021

Answer:

5 acres per day

Step-by-step explanation:

Since it is 30 for 6 days, divide 30 by 6 to get how many per day

Answer Link

Otras preguntas

Which of the following statements about Chinese cities is NOT true? a) Macau, a port city, was a colony of the United Kingdom until 1997. b) Beijing is the capi
If X = 27 yards, Y = 120 yards, and Z = 123 yards, what is the sine of B?
Why did the romans create a system of checks and balances?
when is the product of a decimal number n* 10 always a whole number? Explain yiur answer .
Free Blacks in the North Free Blacks in the South • 75 percent of blacks were free by 1810 • Held low paying jobs • Lived in poverty • Could not vote • Laws pr
Instructions for an inherited trait are called
Wich component of physical fitness lets you lift a low weight barbell many times.
A scientist is studying wildlife . She estimates the population of bats in her state to be 270,000 . She predicts the population to grow at an average of 2.9% .
Which of these would be an example of a point mutation? A)ATTCCCGAA  TATGGGCTT B)ATTCCCGAA  TAAGGGCTT C)TTTGGACAC  AAACCTGTG D)GAGCACATA  CTCGTGTAT
What options did the US have to counter the Soviet build-up of missiles in Cuba?