A certain job takes 2 people 50 hours to complete. How many people are needed to complete the job in 25 hours?

Respuesta :

crimsonkid521
crimsonkid521 crimsonkid521
  • 20-11-2021
Simple answer 1 because 50 divided by 25 is 2 so it takes one person because two people do it on 50 hours
Answer Link
diana061 diana061
  • 20-11-2021
Answer: 1 person. Each person takes 25 hours each for both people complete the 50 hour job, so for one person it’ll be 25 hours.
Answer Link

Otras preguntas

Linda had a garage sale. She set up three tables at the garage sale and all items on the same table cost the same amount. On table A, items cost $1.25 each.
A person walked 1.5 miles in 28 minutes and then jogged 1.2 more miles in 10 minutes. What was the average speed in miles per minute?
What are ten ways we use wind?
Which was a reason the Iraq War did not end quickly? The millitary had to spend additional time disposing of weapons of mass destruction safely. The US departme
a piece of yellow yard was 230 inches long. After 90 inches had been cut from it, the piece of yellow yarn was twice as long as  piece of blue yarn. How much lo
What's an example sentence using pure substance
Ayana bought a cibtsiber of peanuts. She gave 1/5 of the peanuts tie vibe sister and 3/4 of what remained to another sister. She kept the rest tie herself. What
which colony was the last to become a state?
13xy-8 I can't find anything to help me on this so please write the answer or just explain. please!!
how to you do Increase 300 by 54%