sshelemilybean sshelemilybean
  • 18-03-2017
  • Social Studies
contestada

Which of the following is an element that addresses elimination of waste under lean production?
a. production ahead of demand
b. group plant loading technology
c. kanban production control system
d. minimized run times
e. full capacity utilization

Respuesta :

Аноним Аноним
  • 18-03-2017
C) kanban production control system.
Answer Link

Otras preguntas

completa el cuadro con la conjugacion correcta en presente de cada verbo
Pls help on this but can u take a screenshot and graph it? I’ll give brainliest. Pls and thank u
If a gas has a volume of 750 l at 298 k, what would the volume of the gas be at 328 k?.
What is believed to be the reason for the transformation of Celtic goddesses from a balanced , dual - nature role into one with a greater emphasis on death and
A school improvement committee is raising money for new computer equipment by selling T-shirts and hats with the school mascot printed on them. The school earns
how is Robot different from a living dog​
How long will you have to push for the puck to reach the same speed v ?.
please help i spent all my points on this
i need help with this
the votes have been counted for the next school president active or passive