Identify the two key disadvantages of waterfall development-based methodologies.

Respuesta :

somethingradom2007
somethingradom2007 somethingradom2007
  • 21-02-2024

Answer:

Design flaws, when discovered, often mean starting over from scratch

Delaying the testing until the end of the development in common

Answer Link

Otras preguntas

Victorian England can be described as a period of o contrasts atheism civil rights imagination
6) Jimmy's school is selling tickets to a play. On the first day of ticket sales the school sold 6 adult tickets and 8 child tickets for a total of $50. The sch
The concept of market conduct includes such things as ____.
This is confusing, I need some help on it
When the voltage is increased in a circuit with a single resistor that obeys Ohm's law, what will happen to the current in the circuit?
Earthworm behavior lab report. What is your hypothesis for this experiment?
All members of our painting team paint at the same rate. If $20$ members can paint a $6000$ square foot wall in $24$ minutes, then how long would it take the $2
In order to join an online learning community, there is there is a $20 startup fee and $5 monthly fee. Write an equation in slope-intercept form that model this
Conjugate the verb limpiar
write a composition on : Happiness is an expensive pursuit today. How far do you agree?​