In a work breakdown structure, the sequence of tasks in which there is no slack is referred to as:

Respuesta :

Kalahira
Kalahira Kalahira
  • 25-10-2017
Critical path, the sequence of the tasks where there is no slack. Meaning if one task doesn't start on time because another has not yet been completed, there is no down time and there will inevitably be a delay in the project.
Answer Link

Otras preguntas

The security classification guide (scg) states: (u) mission (c) personnel (u) location (s) mission and location the new document states: bravo company will be d
Which triangle is possible? 3 ft, 4ft, and 5ft 4yd, 5ft, and 10yd 3 ft, 3 ft, and 7 ft. 4 in, 4 in, and 8 in
Calculate the perimeter of a football field measuring 80m by 50m
write algebraic expressions to represent the following: a) the sum of x and y b) the product of m and 7 c) the cost of 3 movie tickets at m dollars each d) 3 le
Lisa and penny are guests at a beachside hotel. lisa is laying on a towel at the beach which is 50 feet from the base of the hotel. when shi looks up at an angl
Question 1 of 10 In a network, switches and routers can use MAC addresses to identify devices because: A. MAC addresses are assigned by the router or switch. B.
Use the figure to answer the following question. What is the area of the figure? (Round to the nearest hundredth.) Use the figure to answer the following questi
Should the U.S get involved in the Ukraine Crisis with Russia? Why or why not? Give two reasons for your point of view.
PLEEEEEASE HELP MEEE!
Pls help! Due soon!!