mhorn423 mhorn423
  • 19-10-2017
  • Mathematics
contestada

At a toy factory, toy cars are produced on an assembly line. It takes 8.216 seconds to attach the wheels. It takes 3.652 seconds to attach the hood. How long does it take to attach the wheels and hoods on 42 toy cars

Respuesta :

Аноним Аноним
  • 31-10-2017
the answer is 11.868 hopes this helps
Answer Link

Otras preguntas

Given two sides with lengths 34 and 14, which of these lengths would NOT work for the third side of a triangle? 18, 34, 44, 22, 40
find the missing endpoint given one endpoint and midpoint 2) endpoint- ( -4,1) midpoint-(-1,3)
Find the area of a triangle that has a base of 5 in and a height of 3 3/4 in
why are the peninsular river seasonal?
'Word Problems Involving Products and Factoring' Find two consecutive positive numbers such that the product of the sum and difference of the numbers plus 8 is
A car is driving at a speed of 60 mi/h. What is the speed of the car in feet per minute?
find value of x and y 4.)2x-3y=-15 x=4y
Which systems in the body work together to maintain blood sugar levels? Select the best answer.A.digestive, circulatory  B.circulatory, endocrine  C.digestive,
find the missing endpoint given one endpoint and midpoint endpoint-(6,-10) midpoint (-1,2)
Would you like to visit space?Why?