emmacampbell2866 emmacampbell2866
  • 20-10-2017
  • Business
contestada

Variable costing is more appropriate than absorption costing when the decision​ ________.

Respuesta :

Kalahira
Kalahira Kalahira
  • 31-10-2017
It is more important when the decision relates to production planning within the capacity limits in the short run. Variable costing makes it possible for a company’s costs to be based on their production. This can make it easier to manage the financial implications of production and manufacturing.
Answer Link

Otras preguntas

x^3+13x^2+32x+20 please help me factorizing above equation
If 3 dice are rolled at the same time, what is the probability of all 3 dice showing even face values? (i.e. all 3 dice showing 2, 4, or 6)
A solution containing 30% insecticide is to be mixed with a solution containing 50% insecticide to make 200 L of a solutions containing 42% insecticide. How muc
A solution containing 30% insecticide is to be mixed with a solution containing 50% insecticide to make 200 L of a solutions containing 42% insecticide. How muc
Tourist: "How many birds and lions do you have in your zoo?" Zookeeper:"There are 30 heads and 100 feet." Find the number of each animal. I need to know how to
x^3+13x^2+32x+20 please help me factorizing above equation
Who invented the prism?
Who invented the prism?
What is the slope called if zero is on the numerator or top of the fraction?
Who invented the prism?