"when making contingency estimates, the contractor should"

Respuesta :

W0lf93
W0lf93 W0lf93
  • 03-02-2018
The contractor should take into account the time of year, the estimated completion time for the project, the typical weather of the region, and potential for shortages in supply. The time of the year determines the typical weather. Hot weather can slow down the project. Extreme cold or rainy weather would do the same.
Answer Link

Otras preguntas

Jacob's college savings are invested in a bond that pays an annual interest of 6.2% compounded continuously. How long will it take for the money to triple?
Which was one major reason the United States entered World War I on the Allied side? A. France invaded Germany and Germany was an ally of the United States. B.
what is the equation for a number squared is as much as twelve more than a number
what are 5 reasons cells need energy/
Help Me on these questions!!!!!!! On Monday, a work group eats at Ava's cafe, where a lunch special is $8 and a dessert is $2. The total is $108. On Friday, the
Solve for x using quaratic formula:2x^2+7x-3=0?
describe how activity within the earth results in earthquakes
W is the midpoint of UV. If UW = x+23 and WV = 2x+8, What is x?
which of the following ratios is equivalent to 49:35?
System of equations X+3y=73 X+y=27